DECK ,STAIR AND RAILING $2000.00 INCLUDING PAINT AND REMOVAL

#gallery-1 {
margin: auto;
}
#gallery-1 .gallery-item {
float: left;
margin-top: 10px;
text-align: center;
width: 33%; }
#gallery-1 img {
border: 2px solid #cfcfcf;
}
#gallery-1 .gallery-caption {
margin-left: 0;
}

BEFORE

ROTTEN RAILING AD STAIR SUPORT

BEFORE

STARTING DEMOLITION

DEMOLITION NEARLY DONE

RAILINGS PAINTED IN SHOP

TREADS PAINTED TREE COATS TWO ON TOP OF SAND

PAINTED 2X10 TREATED STRINGER

DONE

10X8 FEET PLAYHOUSE READY MADE

10X8 FT PLAYHOUSE WITH DORMER

#gallery-2 {
margin: auto;
}
#gallery-2 .gallery-item {
float: left;
margin-top: 10px;
text-align: center;
width: 33%; }
#gallery-2 img {
border: 2px solid #cfcfcf;
}
#gallery-2 .gallery-caption {
margin-left: 0;
}

WIEVING PLATFORM FOR THE GREEN PROJECT BY ADERA

PREFABRICATED WIEVING PLATFORM IN BURNABY

#gallery-3 {
margin: auto;
}
#gallery-3 .gallery-item {
float: left;
margin-top: 10px;
text-align: center;
width: 25%; }
#gallery-3 img {
border: 2px solid #cfcfcf;
}
#gallery-3 .gallery-caption {
margin-left: 0;
}

MAKING THE PLATFORM IN SHOP

CORNER BRACKET FOR ROOF HAD TO BE CUT WITH AN ANGELED GROVE

TESTING SO IT IS THE RIGHT ANGELS FOR ROOF LINE

THE 2X6 CEDAR FROM CORNER POST

ROOF [...]

Bonnie Builders SeaCan Lab Mitchell Island Vancouver – Conception Del Oro Mexico

Portable mining labs for Aura Minerals. Lab mock up made on Mitchell Island, packed and braced for transport by boat and truck to Del Oro mine in Mexico. Put together and fully functioning.

Adera Salus Project

This is how we build a 3700sq ft building efficiently on site. All panels was made in our own shop in Surrey, BC Canada.  At the time we were on site most of the other sites in the area were closed down due to snow .